Monday, 19 January 2015

Almost there

I like it!

The project has moved ahead nicely, we decided on asphalt shingles and found a deal at our local building supply store.  We also picked up some cedar siding that will add some character to the outside.  Its a tall so we decided to break up the vertical lines a bit by using board and baton on the lower part of the building and cedar shingles on the upper. We had zero experience in both but I think we did a decent enough job.

With the siding finished, the door painted and the trim completed now all we have to do is install the door, paint the inside and decorate.  Where are those paint samples...?


Mike laying out the shingles

Pam's Dr. Who door.  

Red trim for a red door

Window detail.  We want to have a stained
glass window with a half moon design.

Almost there, still needs the trim and gutters installed

No comments:

Post a Comment